Distribution: inventory and transport - distribution resource planning (DRP-II)

3 important questions on Distribution: inventory and transport - distribution resource planning (DRP-II)

What is a master schedule?

A time-phased plan of the items that need to be produced or purchased to be able to meet customer demand at the required moments.

What is the rough-cut capacity planning (RCCP)?

The RCCP is a global planning that takes the availability of people, machines and materials into consideration, as well as the availability of financial means for allowing the production and distribution to run without interruptions.

What is the capacity requirements planning (CRP)?

The CRP is the detailed capacity planning that includes the availability per time unit of resources such as people, means of transport and storage facilities.

The question on the page originate from the summary of the following study material:

  • A unique study and practice tool
  • Never study anything twice again
  • Get the grades you hope for
  • 100% sure, 100% understanding
Remember faster, study better. Scientifically proven.
Trustpilot Logo