These are flashcards an notes made by students on topics like 'project', 'plan' and 'date', originating from:

Study material generic cover image
- Joseph Phillips
ISBN-10 0071775919 ISBN-13 9780071775915
1205 Flashcards & Notes
  • This + 400k other summaries, also in PDF!
  • A unique study and practice tool
  • Never study anything twice again
  • Get the grades you hope for
  • 100% sure, 100% understanding
Remember faster, study better. Scientifically proven.
Trustpilot Logo

Study Cards on project, plan, date

Monte Carlo analysis
A what-if scenario tool to determine how scenarios may work out, given any number of variables. The process doesn't actually create a specific answer, but a range of possible answers. When Monte Carlo is applied to a schedule, it can present, for example, the optimistic completion date, the pessimistic completion date, and most likely completion date for each activity in the project.
Report
Precedence diagramming method
The most common method of arranging the project work visually. The PDM puts the activities in boxes, called nodes, and connects the boxes with arrows. The arrows represent the relationship and the dependencies of the work packages.
Report
Schedule management plan
A subsidiary plan of the overall project plan, used to control changes to the schedule. A formal schedule management plan has procedures that control how changes to the project plan can be proposed, accounted for, and then implemented.
Report
Start no earlier than (SNET)
A project constraint that demands that a project activity start no earlier than a specific date.