These are flashcards an notes made by students on topics like 'wbs', 'project' and 'activity', originating from:

Study material generic cover image
- Joseph Phillips
ISBN-10 0071775919 ISBN-13 9780071775915
1205 Flashcards & Notes
  • This + 400k other summaries, also in PDF!
  • A unique study and practice tool
  • Never study anything twice again
  • Get the grades you hope for
  • 100% sure, 100% understanding
Remember faster, study better. Scientifically proven.
Trustpilot Logo

Study Cards on wbs, project, activity

What are the most important considerations for a project manager when examining the sequencing outputs and preparing for scheduling?
  • Schedule only required work
  • FS relations are the most common and preferred
  • Activity sequencing is not the same as scheduling
  • First comes activity sequencing, then scheduling
Report
What is the purpose of a project network diagram? (PND)
It illustrates the flow of project work and the relationship between work packages. Most PNDs are AON (Activity on Node) and use Precedence Diagramming Methods (PDM)
Report
What should a PND be accompanied by?
An explanation of the workflow, why decisions where made and details on the preferred logic.
Report
How does change impact the PND?
Change to the project impact the project scope, thus the WBS and most likely the activity list that needs to be updated.
Report
What updates may be made to the WBS ?
  • When based upon the activity list one discovers that the WBS is not complete
  • When the discovery is made that the WBS elements are not defined fully or correctly
  • Updates to reflect newly discovered information like cost estimates
Report
What are updates to the WBS also called?
Refinements. These ensure that all of the deliverables are accounted for within the WBS.